Guangxin Tent/Case studies/Chengdu basketball

Chengdu basketball tent
Soft-glass enclosure and anchoring

Available project materials document an 18 m x 40 m x 6 m basketball tent in Chengdu, with aluminum profiles, soft-glass enclosure and ground-anchor details.

Chengdu basketball tent interiorCHENGDU / SPORTS VENUE

BUYER SNAPSHOT

Sports spaces need visibility
and a reliable ground plan.

This case places court cover, visibility and anchoring in one conversation for sports venues, training facilities and temporary activity spaces.

Location
Chengdu, Sichuan, China
Documented size
18 m × 40 m × 6 m
Material notes
112 × 203 mm aluminum profile; 750 g/m² roof fabric
Enclosure & detail
Soft-glass walls and ground-anchor photographs

Case note: Size and material notes come from available project materials. This page does not replace structural calculations, method statements or local compliance review.

01 / COURT COVER

Keep the playing surface continuous

The open interior keeps the relationship between court, spectators and service movement clear. A final scheme still needs to coordinate seating, lighting, ventilation and equipment.

Completed interior of the Chengdu basketball tent
Public project material: completed basketball interior

02 / SOFT-GLASS ENCLOSURE

Keep visibility while creating a boundary

Soft-glass walls can support daylight and viewing, but handling, rolling, connections, weather response and maintenance should be discussed early.

Soft-glass wall panel for the Chengdu basketball tent
Public project material: soft-glass enclosure detail

03 / GROUND ANCHORING

Make the ground condition part of the brief

Anchoring affects safety, preparation and installation rhythm. Include the ground type, foundation condition and installation window when requesting a proposal.

Ground anchor detail for the Chengdu basketball tent
Public project material: ground anchoring configuration

FAQ / BUYING QUESTIONS

What do sports-tent buyers ask?

Is this a complete engineering file?

No. It is a case built from available images and notes. Complete engineering records should be checked during the project.

Are soft-glass walls included automatically?

No. Enclosure materials, connections and maintenance scope should be written into the scheme and quotation.

Why provide ground information early?

Ground condition affects anchoring, preparation, safety and schedule, making it a key input for sports-space enquiries.